Outstanding Achievement Award
Olympic Games, Beijing, China
Röder Zelt-und Veranstaltungsservice GmbH, Budingen, Hessen, Germany
Röder Zelt-und Veranstaltungsservice GmbH delivered more than 500 tents totaling well over 40,000m2 of tents to Beijing for the 2008 Olympic Games. The material for the big tents came from the factory in Büdingen, Germany; the small tents came from the branch in Shanghai. The biggest tent ensemble (100m x 185m) with a capacity of approximately 16,000 seats served as a restaurant for the athletes and officials in the Olympic Village, covering a ground area of 18,500m2. All tent structures were also used for the Paralympics Games which took place in September 2008.
-
Outstanding Achievement Award Olympic Games, Beijing, China Röder Zelt-und Veranstaltungsservice GmbH, Budingen, Hessen, Germany -
Outstanding Achievement Award Olympic Games, Beijing, China Röder Zelt-und Veranstaltungsservice GmbH, Budingen, Hessen, Germany
